
Mapei Planiseal PMB Moisture Barrier and Bonding Agent
A one-component polyurethane moisture barrier and bonding agent for concrete subfloors under vinyl and engineered hardwood. Comes in a 3.5 gal pail.
Free pickup in Markham once it arrives (1–2 weeks) · GTA delivery $140
Specs
| Category | Moisture Barriers |
| Unit sold | 3.5 gal |
| Availability | Order-in — usually 1–2 weeks |
| Floor types | Vinyl Flooring, Engineered Hardwood |
| Code | 94243-13 |
Documents & Downloads
Official Mapei documents for Mapei Planiseal PMB Moisture Barrier and Bonding Agent — the same warranty, installation and technical sheets our installers work from. PDFs open in a new tab.
- TDSMAPEI Planiseal PMB — Technical Data SheetEN · 6 pg · 1.4 MBPDF
- Technical Data Sheet (2438513)EN · 4 pg · 809 KBPDF
- Technical Data Sheet (2438513)EN · 4 pg · 861 KBPDF
- Fiche Technique (2438513) (FR)Français · 4 pg · 866 KBPDF
- SDSMAPEI Planiseal PMB — Safety Data SheetEN · 12 pg · 197 KBPDF
- Safety Data Sheet (2438513)EN · 10 pg · 267 KBPDF
- Safety Data Sheet (2438513)EN · 9 pg · 181 KBPDF
- Feuillet de sécurité (2438513) (FR)Français · 9 pg · 184 KBPDF
Show 3 more documents ↓Show fewer ↑
- CertCertification (2438513)EN · 4 pg · 142 KBPDF
- InfoInformation Document (2438513)EN · 2 pg · 298 KBPDF
- Document d'information (2438513) (FR)Français · 2 pg · 306 KBPDF
Need a document that isn't listed, or help reading a spec? Call (647) 428-1111 — we'll pull it from the manufacturer for you.
How to use Mapei Planiseal PMB Moisture Barrier and Bonding Agent
- 1Make sure the subfloor is clean and dry before rolling the barrier out.
- 2Roll it out across the room, overlapping seams and sealing them per the product’s instructions.
- 3Run it slightly up the wall at the perimeter — your baseboard or shoe moulding will hide the excess.
- 4Avoid puncturing the barrier in the field; keep any fasteners to the very edge where trim will cover them.
- 5Install your new flooring directly over the sealed barrier.
Related supplies
FAQ
What moisture barrier thickness do I need over concrete?
6-mil poly (or thicker) is the standard minimum most independent flooring guides and manufacturers point to for laminate, SPC, and engineered wood over a concrete slab. Thinner film isn’t considered a real vapor barrier.
Do I still need underlay if I use a moisture barrier?
Usually yes for laminate — the moisture barrier blocks vapor from the slab, but most laminate still needs a separate underlay for cushioning and sound unless the barrier is combined with a pad (like our 3-in-1 rolls) or the plank has one attached.
Not sure which product you need?
Use our supplies calculator to get a full kit recommendation for your floor type and subfloor, or ask us directly.



