
Roberts Moisture Barricade Poly Vapour Barrier
6-mil poly sheeting laid under floating engineered and laminate floors on concrete subfloors to block moisture from below.
Free pickup in Markham once it arrives (2–4 business days) · GTA delivery $140
Specs
| Category | Moisture Barriers |
| Unit sold | 120 sqft roll |
| Availability | Order-in from our supplier’s Ontario warehouse — usually 2–4 business days |
| Coverage | ~120 sq ft per roll |
| Floor types | Engineered Hardwood, Laminate Flooring |
| Code | Q70115 |
Documents & Downloads
Official Roberts documents for Roberts Moisture Barricade Poly Vapour Barrier — the same warranty, installation and technical sheets our installers work from. PDFs open in a new tab.
- WarrantyWarranty Document Limited LifetimeEN · 1 pg · 103 KBPDF
- InstallInstallation Guide: 70-115/70-116/70-117/70-118 InstructionsEN · 1 pg · 308 KBPDF
- Moisture Barricade 70-115/70-116 Installation InstructionsEN · 1 pg · 260 KBPDF
- TDSTechnical Data Sheet Moisture Barricade Polyethyle Film (2014)EN · 2 pg · 1.6 MBPDF
- SDSSafety Data Sheet Polyethylene Underlay Film (2023)EN · 4 pg · 41 KBPDF
- Brochure2025 ROBERTS US Tools Catalog (also linked from every CA product page)EN · 84 pg · 18 MBPDF
- Brochure / Catalogue: ROBERTS Adhesive Product Guide (Small)EN · 8 pg · 4.5 MBPDF
- Brochure / Catalogue: ROBERTS Underlayment Product GuideEN · 8 pg · 9.1 MBPDF
Need a document that isn't listed, or help reading a spec? Call (647) 428-1111 — we'll pull it from the manufacturer for you.
How to use Roberts Moisture Barricade Poly Vapour Barrier
- 1Make sure the concrete slab is clean, dry and free of dust before rolling out the film.
- 2Roll the poly film out across the slab, printed side up, running sheets the long way across the room to minimize seams.
- 3Overlap each sheet by at least a few inches at the seams and press the built-in adhesive strip down to bond the sheets together and seal the seam.
- 4Run the film up the wall at the perimeter slightly — your baseboard or shoe moulding will cover the excess once the floor and trim are in.
- 5Lay your new laminate, SPC, or engineered wood floor directly over the sealed film — it’s a Class 1 vapor barrier rated for use under all three.
- 6Don’t staple or nail through the film field — punctures defeat the moisture barrier; keep fasteners to the very edge where trim will cover them.
Related supplies
FAQ
What moisture barrier thickness do I need over concrete?
6-mil poly (or thicker) is the standard minimum most independent flooring guides and manufacturers point to for laminate, SPC, and engineered wood over a concrete slab. Thinner film isn’t considered a real vapor barrier.
Do I still need underlay if I use a moisture barrier?
Usually yes for laminate — the moisture barrier blocks vapor from the slab, but most laminate still needs a separate underlay for cushioning and sound unless the barrier is combined with a pad (like our 3-in-1 rolls) or the plank has one attached.
How much Roberts Moisture Barricade 6-mil Poly (120 sqft) do I need?
Use the calculator on this page — enter your square footage and we’ll size the exact quantity, based on 1 roll covering about 120 sq ft.
Not sure which product you need?
Use our supplies calculator to get a full kit recommendation for your floor type and subfloor, or ask us directly.



