Subfloor Prep — Self-Leveling Compound & Patch

A flat subfloor is the part of a flooring install nobody sees and everybody notices when it’s skipped — dips and ridges telegraph through laminate and vinyl, and can leave engineered or solid hardwood squeaking or gapping over time. Before any new floor goes down, the existing subfloor needs to be within the flooring manufacturer’s allowable flatness tolerance, and that usually means either a targeted patch or a full self-leveling pour.

We stock both ends of that job: Ardex Feather Finish and Ardex GPS for smaller gouges, seams and low spots that just need a trowel and a bit of feathering, and Ardex K 15 or Custom LevelQuik ES for a subfloor that’s sloped or uneven across a larger area and needs a full self-leveling pour. Concrete subfloors need a compatible primer first in almost every case — it’s the step that gets skipped most often and the one most likely to cause a leveler to fail. The decision table below is the short version of which product fits which job.

Patch compound vs. self-leveling pour

Subfloor conditionUse
Small gouges, seams, isolated dipsArdex Feather Finish or Ardex GPS (trowel-applied patch)
Sloped or uneven across a large areaArdex K 15 or Custom LevelQuik ES (self-leveling pour)
Bare concrete before any leveler aboveArdex P 51 primer first
Need more working time for a DIY pourCustom LevelQuik ES (extended setting)
Fastest re-cover for a small patchArdex Feather Finish (flooring in as fast as 15–20 min)

Subfloor Prep

Self-levelling underlayment and patch/skimcoat compounds, sold per bag.

Ardex K 15 Self-Leveling Underlayment (55 lb)
55 lb bag

Premium self-leveller — flattens uneven slabs before any floor goes down.

1 bag covers ~50 sqft → 500 sqft needs 10 bags

$130.75/ bag
Custom LevelQuik ES Self-Leveling Underlayment (50 lb)
50 lb bag

Extended-set self-leveller for larger pours.

1 bag covers ~50 sqft → 500 sqft needs 10 bags

$48.85/ bag
Ardex Feather Finish (10 lb)
10 lb bag

Cement-based skim coat for feathering seams and low spots to zero.

$91.95/ bag
Ardex GPS General Patch & Skimcoat (25 lb)
25 lb bag

Fast-setting patch for holes, cracks and plywood seams.

$62.95/ bag

How-to guides

FAQ

Do I need to level my subfloor before installing new flooring?

Most flooring manufacturers specify a maximum allowable dip — commonly around 3/16" over a 10-foot span, though this varies by product, so check your flooring’s installation instructions. If your subfloor has low spots, humps, or an old adhesive residue pattern beyond that, levelling it first prevents dips telegraphing through the new floor and voiding the warranty.

Patch compound or full self-leveling pour — which do I need?

Small gouges, seams, and isolated low spots are a job for a patch/skimcoat compound like Ardex Feather Finish or Ardex GPS — quick, trowel-applied, no mixing equipment needed. A subfloor that’s sloped or uneven across a large area needs a self-leveling underlayment (Ardex K 15 or Custom LevelQuik ES) that pours and finds its own level.

Do I need to prime before pouring a self-leveler?

On concrete, yes — nearly every self-leveling underlayment manufacturer requires a compatible primer first (Ardex P 51 for Ardex K 15) so the leveler doesn’t dry too fast at the surface and lose its bond to the slab. Skipping this step is one of the most common reasons a self-leveler cracks or delaminates.

How thick can I pour a self-leveler in one shot?

Ardex K 15 levels up to about 1/4" per pour and can be tapered at the edges to meet existing elevations. Custom LevelQuik ES (the "Extended Setting" formula) can be poured up to about 1.5" thick in one shot, and gives you more working time before it sets — useful for a larger room or a DIY pour without a pump.

How long before I can install flooring over a self-leveler or patch compound?

It depends on the product and your new floor covering — Ardex Feather Finish can be ready for flooring in as fast as 15–20 minutes since it’s self-drying, while a full self-leveling pour typically needs several hours to walk on and up to 16 hours before installing most floor coverings. Always check the bag for the exact schedule on the day you pour.